Boiler, hot water tanks and distribution pipe-work in greenhouses should all be adequately lagged, kept weatherproof and in good repair | ![]() |
Reduce energy used to heat greenhouses |
Link details:
The strength/importance of this link is 6
This link is a Positive contribution.
Literature supporting this link:
Best Practice Guidance:
Defra Project IF0131
Assessment of reduction in environmental burdens through targeted measures compared with whole farm approaches in cropping and livestock systems
© AERU, University of Hertfordshire
Friday 30 October 2009